Quantity-Based Metrics: The Missing Step Before Trusting a Cost Estimate
A complete cost estimate is not necessarily a validated one. Quantity-based metrics help organizations benchmark productivity, quantities, and costs against historical projects to verify estimate credibility before major investment decisions. Learn how benchmarking, Cost Breakdown Structures, and historical project databases improve estimate validation, reduce cost uncertainty, and strengthen confidence throughout the Front-End Loading (FEL) process.

Roger Farish
2 min read


Emerging Technology Cost Estimating: When There's No History to Build From
Estimating emerging technologies requires more than traditional equipment factors. When no historical cost data exists, novel equipment must be estimated using bottom-up methods supported by documented assumptions and engineering judgment. This article explains how combining factored and first-principles estimating improves estimate transparency, communicates uncertainty more clearly, and strengthens confidence in early capital investment decisions.

Roger Farish
2 min read


Demystifying Estimate Accuracy: What Actually Breaks Down, and Why It Persists
Estimate classification and estimate accuracy are often treated as the same thing, but they answer different questions. This article explores why projects frequently overstate estimate confidence by confusing scope maturity with cost certainty. Drawing on recent AACE research, it explains how project definition, estimating methodology, engineering maturity, and quantified risk together determine whether a capital cost estimate is truly credible and decision-ready.

Roger Farish
2 min read


Capital Cost Estimating: From Concept to Cost with Aspen Capital Cost Estimator (ACCE)
Traditional early-phase estimating methods provide speed, but often fail to reflect actual project configuration. Aspen Capital Cost Estimator (ACCE) improves estimate credibility by linking engineering definition directly to structured, configuration-driven cost models. This approach helps teams evaluate alternatives faster, improve transparency, and make stronger investment decisions during FEL.

Roger Farish
2 min read


The Lang Factor in Capital Project Estimating (Part 2): A Practical Framework for Credible Class 5 Estimates
Early factored estimates still play an important role in front-end project development, but only when applied with discipline. This article presents a practical framework for developing credible Class 5 estimates by clarifying scope boundaries, separating ISBL and OSBL costs, and supplementing equipment-factored methods with structured adders. The focus is not precision, but transparency, defensibility, and decision readiness at the earliest stages of capital projects.

Roger Farish
26 min read


The Lang Factor in Capital Project Estimating (Part 1): Why It Breaks Down in Modern Projects
The Lang Factor remains one of the most widely used tools in early capital project estimating. The issue is not that it is outdated, but that it is often asked to do work it was never designed to perform. Frequently interpreted as a proxy for Total Project Cost, Lang-type estimates can create false certainty at the front end of projects. This article explains why the Lang Factor breaks down in modern projects and where it still adds value.

Roger Farish
25 min read


Escalation Under Volatility: Why Traditional Cost Forecasting Breaks Down
Under sustained market volatility, simplified escalation assumptions no longer hold. Materials, labor, equipment, and logistics respond differently to market forces and schedule changes. Applying a single rate creates false precision and hides exposure. Treating escalation as a time-dependent, market-driven risk, separate from contingency and aligned with schedule and commercial strategy, improves cost transparency and early decision confidence.

Roger Farish
1 min read


Escalation Is Not Inflation: Why Treating Them the Same Hides Cost Risk
Escalation is not inflation. Inflation reflects broad economic trends, while escalation measures how the specific materials, labor, and equipment your project depends on will change over time. Treating them as the same can hide real cost exposure and create false early confidence. A defensible escalation approach aligns assumptions with scope, schedule, and market conditions to protect estimate credibility and investment decisions.

Roger Farish
2 min read


What Is a Basis of Estimate (BoE)? A Checklist for Capital Projects
A Basis of Estimate (BoE) is the documented foundation of a capital cost estimate. It explains scope, methods, assumptions, pricing basis, uncertainty, contingency, and changes so decision-makers can assess the estimate with confidence.

Roger Farish
6 min read


Independent Estimate Reviews: How to Validate Costs and Improve Estimate Accuracy
Even strong estimating teams can miss critical details in early project phases.
Assumptions get overlooked, escalation rates are misapplied, contingencies are stretched too thin, and scope boundaries can blur. These gaps do more than distort the numbers; they influence investment decisions, funding approvals, and negotiations that define project success.

Roger Farish
5 min read


Capital Project Estimating: Why Independent Support Improves Accuracy
In today’s complex project landscape, capital project estimating faces unprecedented challenges. From modularization and decarbonization to supply chain volatility and labor shortages, the rules that guided projects a decade ago no longer apply. Yet owners still rely on early estimates to make billion-dollar investment decisions.

Roger Farish
2 min read


Should-Cost Estimating: Closing the Gap Between Price and Value
In capital projects, price and value rarely align.
That is where should-cost estimating becomes essential, helping owners uncover what a project ought to cost under optimal conditions, not just what a contractor quotes.

Roger Farish
2 min read


Integrated Estimate Plan and Basis of Estimate: Improving Cost Estimate Accuracy in FEL
Many cost estimate failures are not caused by poor estimating techniques, but by a lack of alignment between the Estimate Plan and the Basis of Estimate. When developed separately, inconsistencies in scope, assumptions, quantities, and methodology can go undetected. Integrating both into a single workflow improves traceability, strengthens estimate credibility, and supports better investment decisions in FEL.

Roger Farish
7 min read


Is Your Basis of Estimate (BoE) Setting Your Capital Project Up for Success?
In capital project estimating, the Basis of Estimate (BoE) often gets less attention than it deserves. It may not grab headlines like...

Roger Farish
3 min read


Top 5 Estimating Mistakes in Capital Projects—And How to Avoid Them
Capital project estimates do more than forecast cost—they shape funding decisions, drive stakeholder confidence, and influence how a...

Roger Farish
3 min read